top of page

Cerno Cutting Room Review & Assurance

The complete review and assurance pathway

1

Remote Review

Independent evaluation of factory-supplied data and representative production records.

2

Verified Remote Diagnostic

Adds supporting evidence, management interviews, data validation and stronger opportunity quantification.

3

Five-Day On-Site Diagnostic

Physical verification of cutting-room execution, fabric losses, machine capacity, workflow and management controls.

4

Implementation & Cost Recovery

Trials, training, revised processes, stronger controls and verification of recovered value. Available as consultant-led implementation or licensed factory-specific implementation documentation.

5

Continuous Performance Monitoring

Ongoing KPI review, exception reporting, trend analysis and management assurance.

LEVEL 1 – Remote Review

Remote Review

Independent evaluation of factory-supplied data and representative production records.

Areas reviewed can include:

  • Production output and daily targets
  • Orders and cut planning
  • Marker performance
  • Fabric utilization
  • Fabric width
  • Ply planning
  • Spread planning and productivity
  • Cut-plan adherence
  • Automated cutter utilization
  • Manpower
  • Shift configuration
  • End loss
  • Process loss
  • Fabric reconciliation
  • Cost per piece
  • Capacity
  • Workflow and WIP
  • Management visibility

You receive:

  • Independent Cerno analysis
  • Management KPI review
  • Identification of operational opportunities
  • Priority recommendations
  • Client-facing Cerno report
  • Remote findings meeting

Ideal for factories wanting an independent review before committing to an on-site diagnostic or implementation programme.

LEVEL 2 – Verified Remote Diagnostic

Verified Remote Diagnostic

Adds supporting evidence, management interviews, data validation and stronger opportunity quantification.

Evidence may include:

  • CAD reports
  • Marker records
  • Cut plans
  • Fabric roll information
  • Spreading records
  • Cutter files
  • Machine reports
  • Production records
  • Fabric reconciliation
  • Photographs
  • Videos
  • Live cutting-room walkthroughs

Cerno evidence status:

  • Verified Evidence — information supported by system records, documentation or direct remote observation
  • Factory Declared — information supplied by the factory but not independently verified
  • Calculated — performance calculated by Cerno from supplied information
  • Observation Required — areas where an on-site assessment is recommended before a firm conclusion is reached

You receive:

  • Detailed evidence-backed Cerno diagnostic
  • KPI assessment
  • Identified cost-recovery opportunities
  • Priority areas requiring management attention
  • Client-facing diagnostic report
  • Management presentation
  • Recommended next-step roadmap

LEVEL 3 – Five-Day On-Site Diagnostic

Five-Day On-Site Diagnostic

Physical verification of cutting-room execution, fabric losses, machine capacity, workflow and management controls.

The diagnostic can examine:

  • Fabric utilization
  • CAD and marker strategy
  • Cut planning
  • Ply and lay optimization
  • Fabric width utilization
  • Fabric preparation and relaxation
  • Spreading productivity
  • Automated cutting
  • Cutter utilization
  • Machine capacity
  • Downtime
  • Manpower
  • Shift configuration
  • Workflow
  • WIP
  • Reconciliation
  • Process loss
  • Cost per piece
  • Production capacity
  • Management controls
  • Training and capability

You receive:

  • Detailed Tela Cerno diagnostic
  • Evidence-supported findings
  • Management report
  • Cost-recovery roadmap
  • Prioritized recommendations
  • Implementation priorities
  • Management presentation

LEVEL 4 – Implementation & Cost Recovery

Implementation & Cost Recovery

Trials, training, revised processes, stronger controls and verification of recovered value. Available as consultant-led implementation or licensed factory-specific implementation documentation.

Implementation can focus on:

  • Cut-plan optimization
  • Marker strategy
  • Fabric utilization
  • Ply planning
  • Lay-length optimization
  • Roll allocation
  • Spread planning
  • Spreading productivity
  • Automated cutter utilization
  • Manpower
  • Shift structure
  • WIP reduction
  • Process-loss control
  • Fabric reconciliation
  • KPI development
  • SOPs
  • Training
  • Management control

Programme structure:

Implementation programmes can be structured into multiple visits, allowing agreed actions to be introduced, measured and verified between each stage.

LEVEL 5 – Continuous Performance Monitoring

Continuous Performance Monitoring

Ongoing KPI review, exception reporting, trend analysis and management assurance.

Monthly monitoring can include:

  • Output versus target
  • Cut-plan adherence
  • Marker performance
  • Fabric utilization
  • Spreading productivity
  • Cutter utilization
  • Machine capacity
  • Process loss
  • Fabric reconciliation
  • Manpower performance
  • Cost per piece
  • WIP
  • Overtime
  • Exceptions and trends
  • Management opportunities

Each month you receive:

  • Independent performance review
  • KPI assessment
  • Trend analysis
  • Exception identification
  • Management intelligence
  • Priority recommendations
  • Cerno management report
  • Remote review meeting

Identify performance deterioration early and keep improvements moving in the right direction.

How the Cerno Review Process Works

1. INQUIRY

We discuss your objectives and site configuration.

2. DATA PACK

The factory completes the secure Cerno data pack.

3. ANALYSIS

Tela Cerno processes the data to find anomalies.

4. REVIEW

Our consultants analyze findings and identify risks.

5. REPORTING

Management receives the diagnostic report.

6. ACTION

We define the route to cost recovery and optimization.

Not Ready for a Full Diagnostic?

If you aren't ready for a deep dive, start with an initial independent review to see where your biggest opportunities lie.

Independent. Evidence-Based. Actionable.

info@fabric-utilization.com

Independent. Evidence-Based. Actionable.

Utilization, Optimization, and evidence-led management.

Start remotely. Go deeper when the evidence says you should.

info@fabric-utilization.com

bottom of page